Saukville Well #6

Growing communities need more fresh water

Faust Company won the public bid contract to install the plumbing and mechanic piping for the newly-constructed well #6 in Saukville. These projects include a wide variety of piping work which make them very interesting:

Plumbing: The well building itself has floor drains, hose bibbs and potable water lines for emergency shower and eyewashes.

Chemical Piping: The well injects chlorine into the well water to keep the water and pipe lines disinfected which requires highly sensitive scales and dosing pumps.

Well Piping: The well pumps water into a large reservoir, much like a large-scale version of a residential well tank. From there, the water is pumped out to the municipal water distribution system as needed.